Skip to the project record
E/BENVIRONMENTAL
BOX
Jianuo Li
Loading the assembly
01 / INSTRUMENT

Environmental
Box.

Completed team capstone · Interactive CAD reconstruction

COMPLETED TEAM CAPSTONE / 202601 / 05

Built together.
Seen from within.

A completed team capstone
for evaporation experiments.

Completed team capstone. Front view.
Completed team capstone. Front view.Photograph by Jianuo Li
01 / 03
MY PART IN THE WHOLE

Control-system simplification.
Thermal and moisture system choices.

JIANUO LI · CAPSTONE TEAM MEMBER

The interactive assembly is an AI-assisted CAD reconstruction. Electrical leads are omitted from this display for clarity. The physical glove-port door differs from the plain CAD door. Heating details reflect the reconstructed configuration. The installation animation explains the reconstructed model, rather than documenting the physical build sequence.

DESIGN TARGETS

20–70 °C   /   5–95% RH

Not a verified operating envelope.